Historic Graff Bridge Gets a New Life! — MCS is proud to return to Route 422 over the Allegheny River, Kittanning, PA, to replace the nearly 50-year-old LMC overlay. Details coming soon!

Gordie Howe International Bridge

Detroit, Michigan to Ontario, Canada
Bridging North America
2024

Project Highlights

  • Cubic Yards Supplied: 4,500 CYDS

  • Latex Type: Trinseo MOD A/NA

  • Cement Type: Type IL Lafarge

Project Overview

The Gordie Howe International Bridge (GHIB) is one of the most ambitious infrastructure projects in North America. Connecting Detroit, Michigan and Windsor, Ontario, this new cable-stayed bridge features two soaring towers rising 722 feet high. Once complete, it will carry six lanes of traffic plus a dedicated pedestrian and cyclist path.

To ensure long-term durability, the bridge deck was designed with a Latex Modified Concrete (LMC) overlay. The substrate was poured 1.5 inches below final grade to allow for the overlay, providing a 25-year service life for the riding surface and contributing to the bridge’s 100-year overall design life.

Background & Challenges:

Installing the LMC overlay between October 2 and November 19, 2024, our team faced the tough Detroit-Windsor weather — cold, wet, and windy conditions that tested every pour.

Fortunately, Trinseo’s 2022 Low Temperature Cure of LMC Report provided valuable guidance, helping us navigate the climate challenges successfully. Despite only 24 productive pour days, the team averaged 187 cubic yards per pour, placing the overlay with precision.

Our Solution:

Our strategy was simple: maximize productivity on pour days and prepare thoroughly on non-pour days. This meant long, back-to-back shifts — placing overlays as large as 48’ x 600’ x 2” in a single push.

The results speak for themselves:

  • Zero cracks were detected across the entire LMC overlay.

  • Each section was carefully chain dragged and inspected after curing to confirm strong bonding and no delamination.

By working closely with the contractor and owner, Modified Concrete Suppliers ensured the project stayed on track and met the highest quality standards.

Why Choose Modified Concrete Suppliers:

The GHIB design team selected Latex Modified Concrete because it has proven itself in the field for over 50 years, with overlays still performing today. At Modified Concrete Suppliers (MCS), we take pride in delivering not only quality products but also trusted service — ensuring contractors and owners alike see lasting results.

With every project, our mission is clear:
✅ Protect infrastructure
✅ Extend service life
✅ Deliver value for taxpayers and owners

The Gordie Howe International Bridge stands as a landmark example of how LMC overlays safeguard critical infrastructure for generations to come.

Recent Projects

Baltimore Harbor Tunnel

Baltimore Harbor Tunnel Rehabilitation with High-Performance Latex Modified Concrete Project Overview The Baltimore Harbor Tunnel, a vital transportation link along I-895, required a durable restoration

Read More »
Columbus Convention Center drop-off zone rehabilitation using high-strength Latex Modified Concrete for durable, long-lasting pavement

Columbus Convention Center

Columbus Convention Center Rehabilitation with Latex Modified Concrete Project Overview The Columbus Convention Center is one of the busiest venues in the region, hosting thousands

Read More »